State Hockey Centre, Parkville
Client
Polytan Asia Pacific
Timeframe
Jan 23 - Feb 23
Type
Hockey Field Reconstruction
Project Overview
Apex Civil Construction were engaged by the client to reconstruct the base for the current hockey field at the State Hockey Centre facility in Parkville, Victoria.
Services Provided
Demolition & Excavation:
– Rip and regrade 100mm depth of crushed tock to achieve new design levels
– Compact and trim approximate 100mm depth of additional crushed rock to reach desired base levels within the rip and regrade
Share the project