Lagoon Reserve, Port Melbourne
Client
Evergreen Turf
Timeframe
November 23 - April 24
Type
Natural Turf Sporting Field
Service
Earthworks, Pavements, Drainage
Project Overview
Apex Civil Construction was engaged as the major civil contractor to Evergreen Tuft for the redevelopment of the Lagoon Reserve sporting field in Port Melbourne. Tasked with redeveloping an aged fill site, our team prioritised soil and dust control measures throughout the project’s duration, with consideration for local residents. We collaborated closely with the client to minimise off-site disposal, opting instead to repurpose materials whenever possible. Our commitment to precision and efficiency ensured that all earthworks were completed within the stringent tolerances and tight timeframe demanded by the project
Services Provided
Earthworks:
– cut and fill to design levels
Pavements:
– subgrade preparation
– granitic footpath
Drainage:
– tapped into council point of discharge