Rob Roy Hill Climb, Smiths Gully
Client
MG Car Club Victoria
Timeframe
Sep 2022 - Mar 2023
Type
Motorsport Track
Service
Demolition, Excavation, Drainage, Pavement & Concrete
Project Overview
Apex Civil Construction was contracted by MG Car Club Victoria to undertake significant upgrades to the hill climb facility. Apex resurfaced the race track, added a chicane and a tire cleaning area, performed bulk cut and fill to widen the dam wall, and created a new return road.
Services Provided
Excavation:
– bulk cut and fill
– Installation of electrical conduits under track
Stormwater Drainage:
– Redirecting of water and new outfalls
Pavements & Concrete Works:
– Resurfacing and reprofiling of existing track
– Extending race track to include new Chicane area
– Gully crossing concrete pavement
– Resurfacing of return road
– Construction of tyre cleaning area
– Reshaping and installing new access roads within the facility