Rob Roy Hill Climb, Smiths Gully

Client

MG Car Club Victoria

Timeframe

Sep 2022 - Mar 2023

Type

Motorsport Track

Service

Demolition, Excavation, Drainage, Pavement & Concrete

Project Overview

Apex Civil Construction was contracted by MG Car Club Victoria to undertake significant upgrades to the hill climb facility. Apex resurfaced the race track, added a chicane and a tire cleaning area, performed bulk cut and fill to widen the dam wall, and created a new return road.

Services Provided

Excavation:
– bulk cut and fill
– Installation of electrical conduits under track

Stormwater Drainage:
– Redirecting of water and new outfalls

Pavements & Concrete Works:
– Resurfacing and reprofiling of existing track
– Extending race track to include new Chicane area
– Gully crossing concrete pavement
– Resurfacing of return road
– Construction of tyre cleaning area
– Reshaping and installing new access roads within the facility

Related Projects

Chadstone Car Park, Chadstone
Share the project